www.techaneesh.blogspot.com.

Saturday, October 8, 2016

Top 10 Mobile Technology Trends Which Will Rule 2017


Top 10 Mobile Technology Trends Which Will Rule 2017

1. Going More Mobiles.

2. Growing E-commerce.

3. Payment on-the-go.

4. Wearable Technology


5. It’s all in the clouds.

6. Streaming Technology.

7. All in One Apps.

8. Quicker app development cycles.

9. More free apps.

10. Cross Platform Functionality.


Mobile Technology today is one thing that sees a constant evolution in a matter of months. It is the one that constantly changes and will also stand the sands of time. But mobile technology is only ever as good as the app that functions on it. This is where mobile application developers come in to play. The growing market in app development has seen a boom in mobile technology especially in Asia. This is great news of mobile technology developers in India.

Today, the average mobile app usage in India has grown by at least 131% leading to the rise in mobile development companies in India. This has seen a steady growth in modern day app developers. Mobile technology in India is on the rise and will only get better as the years go by. With that in mind, here are 10 Mobile Technology trends that will rule 2016:
1. Going More Mobiles.









The entire world, let alone India is going mobile. Everyone today prefer their experiences on-the-go and smartphones aim to do just that. Smartphones are available in abundance and are also considered a necessity today making it accessible to all. For mobile application developers in India this just means more apps to be created in general. And that’s a good thing.










The advent and rise of mobile technology and smartphones alike will only seek to rise as time passes by and 2016 will be no exception to this. In 2016, it was found that India has 375 million internet users, of which 303 million were mobile internet users. The evolution of internet facilities will only propel the mobile usage in India for the future.
2. Growing E-commerce.


As of 2015, it’s been reported that 54% of all mobile users make use of e-commerce apps to shop and why not? Everyone likes to shop. The idea of shopping has seen a major overhaul these days. No longer is it feasible to many to actually make a physical trip to the mall to buy things when it all can be done online. Mobile applications make this possible allowing one to purchase virtually anything desirable.
Mobile application developers can be grateful as well since most Indian retailers have joined the push for mobile applications.
3. Payment on-the-go.

Everything works better on mobile now and it’s a trend that will only see physical offices soon be done away with. The trend has also seen a rise in India with mobile app developers constantly tweaking user experience options to make processes simpler.



4. Wearable Technology

What’s better than carrying a smartphone in your pocket? How about the fact that you can wear it? Wearable technology has seen a steady rise in the west over last year and has also made its way to the eastern side.















The advent of wearable technology such as the Apple Watch only widens the prospect for more creative apps. This new form of technology has been a hit since its inception and is begging for something new to push it even further. A dream come true for mobile application developers.

5. It’s all in the clouds.

Cloud app services have been around for a while now and have only grown more prominent with time. The need for storage facilities on-the-go has been a distant dream in the past but is now seen as somewhat of a necessity. This is especially the case with those who are constantly working on the fly and are in need of a quick storage facility. The public cloud service revenue has reached approximately USD 731 Million according to Gartner and is only expected to grow.


iCloud and Google drive have been the more prominent players in this app market but there have been other 3rd party players distributing free cloud services. With the need for such storage facilities growing in India, Mobile application developers are constantly needed to be on top of their game in maintaining server functionality.



6. Streaming Technology.



Streaming technology has been tossed around a lot in the past and has been seen as a major trend of late that will only seek to increase in stature. More and more as people opt for mobile experiences, so will be the increase in the use of streaming technology.
Everyone today wants to be entertained. Whether at home or on the bus, advancements in both internet and mobile based technologies have made it possible for people to stream all their services at any time. Be it Music or Video experiences, applications such as sound cloud and Youtube have made such experiences possible. What’s incredible is that such services are constantly optimized by mobile application developers to provide the best experience possible consuming the least bandwidth. The trend has only been growing of late and will only continue to do so.

7. All in One Apps.













As stated before, a piece of hardware is only ever as good as the software that runs it. Currently, there are over 750k different apps available to the consumer. Each app is created in such a way to cater to practically every need of a consumer. The idea behind such apps is to make a consumer’s workflow and processes simpler. And that’s what each of apps seek to achieve.
But a new trend these days is the creation of one app that caters to all needs. The conception of all in one apps has been seen as an advantage today since it would reduce the time taken to actually search for specific service apps. These service apps for example cater to many needs such as providing laundry or plumbing services. In India, mobile application developers have been working in tandem with such organizations to bring these convenience apps to the table so that consumers don’t really have to need to download multiple service apps.












8. Quicker app development cycles.


With time comes newer apps and therefore no need for older apps. Mobile application developers have been constantly tweaking their apps in such a way that it’s led to quicker development cycles.  












Today, more and more apps are rolled out like hot cakes. The need for speed these days has only advocated for such development cycles and even in a place like India, mobile application developers cater to such.

9. More free apps.



It’s a fact that most of the apps available today are free. Most people wonder as to how mobile application developers make their revenue when the product itself is free to the consumers. The answer is quite simple really, through ‘in-app’ purchases.


The idea works around the fact that if you as a consumer would like to use the app to the fullest of its potential, you’ll need to purchase the extra features. This means that while you get to use the basics of an app for free, in order to use to full package. In-app purchases are becoming the new trend in revenue generation for mobile application developers even in India.

10. Cross Platform Functionality.

This is another major trend these days. It is no secret that consumers today own more than one product in terms of mobile based technology. Personal Computing experiences have changed with the introduction of tabs that have been created and removing the need for performance laptops. The same applies to all iDevices. For example, the creation of the newly released iWatch only adds to Apples growing ecosystem.







Everybody knows that the iPhone is Apples flagship product. The introduction of the iWatch only broadens the technology ecosystem by bringing in a secondary experience to the iPhone through a connected network. This opens new opportunities to mobile application developers looking to bring in newer experiences. With the tech having only just been introduced to the Indian markets. It’s a great opportunity of mobile application developers in India to seize the opportunity here.

Sunday, October 2, 2016

5G WIRELESS TECHNOLOGY TUTORIAL.

  5G Mobile Wireless Technology ( 5G WIRELESS            TECHNOLOGY TUTORIAL)


With the 4G telecommunications systems now starting to be deployed, eyes are looking towards the development of 5th generation or 5G technology and services.
Although the deployment of any wireless or cellular system takes many years, development of the 5G technology systems is being investigated. The new 5G technologies will need to be chosen developed and perfected to enable timely and reliable deployment.
The new 5th generation, 5G technology for cellular systems will probably start to come to fruition around 2020 with deployment following on afterwards.

5G mobile systems status.



The current status of the 5G technology for cellular systems is very much in the early development stages. Very many companies are looking into the technologies that could be used to become part of the system. In addition to this a number of universities have set up 5G research units focussed on developing the technologies for 5G
In addition to this the standards bodies, particularly 3GPP are aware of the development but are not actively planning the 5G systems yet.
Many of the technologies to be used for 5G will start to appear in the systems used for 4G and then as the new 5G cellular system starts to formulate in a more concrete manner, they will be incorporated into the new 5G cellular system.
The major issue with 5G technology is that there is such an enormously wide variation in the requirements: superfast downloads to small data requirements for IoT than any one system will not be able to meet these needs. Accordingly a layer approach is likely to be adopted. As one commentator stated: 5G is not just a mobile technology. It is ubiquitous access to high & low data rate services.

5G cellular systems overview


As the different generations of cellular telecommunications have evolved, each one has brought its own improvements. The same will be true of 5G technology.
  • First generation, 1G:   These phones were analogue and were the first mobile or cellular phones to be used. Although revolutionary in their time they offered very low levels of spectrum efficiency and security.
  • Second generation, 2G:   These were based around digital technology and offered much better spectrum efficiency, security and new features such as text messages and low data rate communications.
  • Third generation, 3G:   The aim of this technology was to provide high speed data. The original technology was enhanced to allow data up to 14 Mbps and more.
  • Fourth generation, 4G:   This was an all-IP based technology capable of providing data rates up to 1 Gbps.
Any new 5th generation, 5G cellular technology needs to provide significant gains over previous systems to provide an adequate business case for mobile operators to invest in any new system.
Facilities that might be seen with 5G technology include far better levels of connectivity and coverage. The term World Wide Wireless Web, or WWWW is being coined for this.
For 5G technology to be able to achieve this, new methods of connecting will be required as one of the main drawbacks with previous generations is lack of coverage, dropped calls and low performance at cell edges. 5G technology will need to address this.

5G specifications

Although the standards bodies have not yet defined the parameters needed to meet a 5G performance level yet, other organisations have set their own aims, that may eventually influence the final specifications.
Typical parameters for a 5G standard may include:
SUGGESTED 5G WIRELESS PERFORMANCE
PARAMETERSUGGESTED PERFORMANCE
Network capacity10 000 times capacity of current network
Peak data rate10 Gbps
Cell edge data rate100 Mbps
Latency< 1 ms
These are some of the ideas being put forwards for a 5G standard, but they are not accepted by any official bodies yet.

Current research

There are several key areas that are being investigated by research organisations. These include:
  • Millimetre-Wave technologies:   Using frequencies much higher in the frequency spectrum opens up more spectrum and also provides the possibility of having much wide channel bandwidth - possibly 1 - 2 GHz. However this poses new challenges for handset development where maximum frequencies of around 2 GHz and bandwidths of 10 - 20 MHz are currently in use. For 5G, frequencies of above 50GHz are being considered and this will present some real challenges in terms of the circuit design, the technology, and also the way the system is used as these frequencies do not travel as far and are absorbed almost completely by obstacles. Read more about 5G millimetre wave links
  • Future PHY / MAC:   The new physical layer and MAC presents many new interesting possibilities in a number of areas:
    • Waveforms:   One key area of interest is that of the new waveforms that may be seen. OFDM has been used very successfully in 4G LTE as well as a number of other high data rate systems, but it does have some limitations in some circumstances. Formats being proposed include: GFDM, Generalised Frequency Division Multiplexing, as well as FBMC, Filter Bank Multi-Carrier, UFMC, Universal Filtered MultiCarrier. Each has its own advantages and limitations and it is possible that adaptive schemes may be employed, utilising different waveforms adaptively for the 5G mobile systems as the requirements dictate. This provides considerably more flexibility for 5G mobile communications. Read more about 5G waveforms
    • Multiple Access Schemes:   Again a variety of new access schemes are being investigated for 5G technology. Techniques including OFDMA, SCMA, NOMA, PDMA, MUSA and IDMA have all been mentioned. Read more about 5G multiple access schemes
    • Modulation:   Whilst PSK and QAM have provided excellent performance in terms of spectral efficiency, resilience and capacity, the major drawback is that of a high peak to average power ratio. Modulation schemes like APSK could provide advantages in some circumstances. Read more about5G modulation schemes
  • Duplex methods:   There are several candidate forms of duplex that are being considered. Currently systems use either frequency division duplex, FDD or time division duplex, TDD. New possibilities are opening up for 5G including flexible duplex, where the time or frequencies allocated are variable according toth e load in either direction or a new scheme called division free duplex or single channel full duplex. This scheme for 5G would enable simultaneous transmission and reception on the same channel. Read more about 5G full duplex
  • Massive MIMO:   Although MIMO is being used in many applications from LTE to Wi-Fi, etc, the numbers of antennas is fairly limited -. Using microwave frequencies opens up the possibility of using many tens of antennas on a single equipment becomes a real possibility because of the antenna sizes and spacings in terms of a wavelength.
  • Dense networks   Reducing the size of cells provides a much more overall effective use of the available spectrum. Techniques to ensure that small cells in the macro-network and deployed as femtocells can operate satisfactorily are required.

Other 5G concepts

      There are many new concepts that are being investigated and developed for the new 5th                  generation mobile system. Some of these include:
  • Pervasive networks :   This technology being considered for 5G cellular systems is where a user can concurrently be connected to several wireless access technologies and seamlessly move between them.
  • Group cooperative relay:   This is a technique that is being considered to make the high data rates available over a wider area of the cell. Currently data rates fall towards the cell edge where interference levels are higher and signal levels lower.
  • Cognitive radio technology:   If cognitive radio technology was used for 5th generation, 5G cellular systems, then it would enable the user equipment / handset to look at the radio landscape in which it is located and choose the optimum radio access network, modulation scheme and other parameters to configure itself to gain the best connection and optimum performance.
  • Wireless mesh networking and dynamic ad-hoc networking:   With the variety of different access schemes it will be possible to link to others nearby to provide ad-hoc wireless networks for much speedier data flows.
  • Smart antennas:   Another major element of any 5G cellular system will be that of smart antennas. Using these it will be possible to alter the beam direction to enable more direct communications and limit interference and increase overall cell capacity.
There are many new techniques and technologies that will be used in the new 5G cellular or mobile telecommunications system. These new 5G technologies are still being developed and the overall standards have not yet be defined. However as the required technologies develop, they will be incorporated into the new system which will be defined by the standards bodies over the coming years.

Friday, September 16, 2016

Kudankulam Nuclear Power Plant-A brief view

Kudankulam Nuclear Power Plant


Kudankulam Nuclear Power Plant (or Koodankulam NPP or KKNPP) is a nuclear power station in Koodankulam in the Tirunelveli district of the southern Indian state of Tamil Nadu. Construction on the plant began on 31 March 2002,[1]but faced several delays due to the fishermen's objection.
Unit 1 was synchronised with the southern power grid on 22 October 2013. The original cost of the two units was ₹13,171 crore, but it was later revised to ₹ 17,270 crore ($2.6 billion). Russia advanced a credit of ₹ 6,416 crore ($0.97 billion) to both the units.
In 2015, Nuclear Power Corporation Ltd (NPCIL) announced a price of ₹ 4.29/kW·h (6.4 ¢/kW·h) for energy delivered from Kudankulam nuclear power plant.
The ground-breaking ceremony for construction of units 3 & 4 was performed on 17 February 2016. Work is expected to begin in April 2016. Due to operators and suppliers requirement to insure the two following units, at ₹39,747 crore(US$5.91 billion), the cost of units 3 & 4 is twice the cost of units 1 & 2, .

Background

An Inter-Governmental Agreement (IGA) on the project was signed on 20 November 1988 by then Prime Minister Rajiv Gandhi and then Soviet head of state Mikhail Gorbachev, for the construction of two reactors. The project remained in limbo for a decade due to the dissolution of the Soviet Union.[5] There were also objections from the United States, on the grounds that the agreement did not meet the 1992 terms of the Nuclear Suppliers Group (NSG).[9] M R Srinivasan,Atomic Energy Commission (AEC) Chairman from 1987 to 1990, called the project "a non-starter". However, the project was revived on 21 June 1998.[5]

Construction

Construction began on 31 March 2002, with Nuclear Power Corporation of India Ltd (NPCIL) predicting that the first unit would be operational in March 2007, instead of the original target of December 2007.[5]
A small port became operational in Kudankulam on 14 January 2004. This port was established to receive barges carrying over-sized light water reactor equipment from ships anchored at a distance of 1.5 kilometres (0.93 mi). Until 2004, materials had to be brought in via road from the port of Thoothududi, risking damage during transportation.[10] In 2008, negotiations on building four additional reactors at the site began. Though the capacity of these reactors has not been declared, it was expected that the capacity of each reactor will be 1,200 MW or 1.2 GW.[11][12] The new reactors would bring the total capacity of the power plant to 6,800 MW or 6.8 GW.

Commissioning of Unit 1

The first reactor of the plant attained criticality on 13 July 2013 at 11:05 pm.[13]
KKNPP was first synchronised to grid at 2:45 am on 22 October 2013.[14] Power generation from first nuclear reactor started on the same day. Unit 1 was operating at 73% capacity (680 MW) by April 2014.[15] Unit 1 attained its maximum capacity of 1,000 MWe at 1:20 pm on 7 June 2014 and started commercial operation from 31 December 2014.[16] Till April 2015, KNPP-1 generated 2,783 GW·h of electricity at 97% capacity factor.

Commissioning of Unit 2

Unit 2 achieved first criticality on July 10, 2016. Unit 2 is the second 1,000 MW unit to go critical in India. It was grid-connected in August.[17] Commercial operation is planned beginning 2017. [18]

Construction of Units 3 and 4

The ground-breaking ceremony for construction of units 3 & 4 was performed on 17 February 2016. Work is expected to begin in April 2016.

Design and specification

The reactors are pressurised water reactor of russian design, model VVER-1000/V-412 referred also as AES-92. Thermal capacity is 3,000 MWt and gross electrical capacity is 1,000 MWe. Net capacity is 917 MWe.[20] Construction is by NPCIL and Atomstroyexport. When completed the plant will become the largest nuclear power generation complex in India producing a cumulative 2 GW of electric power.[21] Both units are water-cooled, water-moderated power reactors.
Four more reactors are set to be added to this plant under a memorandum of intent signed in 2008.[26] A firm agreement on setting up two more reactors was postponed.[27]

Operations

Reactor 1 was to begin supplying power to the Central Grid by end of August 2013.[28]
The Kerala State Electricity Board (KSEB) board members have approved signing of a power purchase agreement (PPA) with the Nuclear Power Corporation of India (NPCIL) for sourcing electricity from the Kudankulam nuclear power project (KKNPP).
Unit 1 was shut down in June 2015 for refuelling and annual maintenance. On 21 January 2016 the reactor restarted and was connected to grid on 30 January 2016.[29] Only three weeks later, unit 1 was stopped due to a leakage in a steam pipe.

Opposition

In 2011, thousands from the vicinity of the plant protested against it, fearing a nuclear disaster.[31] According to the protesters, evacuation of people in the event of a nuclear disaster would be impossible.[32] According to S P Udayakumar, of the People's Movement Against Nuclear Energy, "the nuclear plant is unsafe". However, in 2012, the chief of India's nuclear energy programme, Dr Srikumar Banerjee, called the plant "one of the safest" in the world.[33] In December 2012, The Hindureported that hundreds of villagers in the region were largely ignorant of the risks and benefits of the plant.
A Public Interest Litigation (PIL) was filed in 2011 with the Supreme Court asking for nuclear power development to be delayed until safety concerns were independently assessed. In May 2013, the Supreme Court ruled in favour of the plant, stating that the nuclear power plant was in the larger public interest.
In March 2012, nearly 200 anti-nuclear protesters were detained for a few hours by the police. The protesters were set to join protests objecting resumption of work of one of two 1 GW reactors, a day after the local government restarted work on the project.
There have also been rallies and protests in favour of commissioning this nuclear power plant.
On, 24 February 2012, Prime Minister Manmohan Singh blamed foreign NGOs for protests at the power plant. News agencies reported that three NGOs had diverted donations earmarked for religious and social causes to the protests, in violation of foreign exchange regulations.
Supporters of the power plant in Idinthakarai village have been targeted by opponents using improvised explosive devices.

Role of Christian organisations

In March 2012, officials from the Ministry of Home Affairs investigated two Christian organisations for supporting the protest against the KKNPP.The Church of South India, The Catholic Bishops Conference of India and the National Council of Churches openly oppose the KKNPP. Videos showing the deformities caused by nuclear accidents were shown at a church in Idinthakarai.Union Minister of State V. Narayanasamy said that three non-governmental organisations (NGOs) had their permission to foreign funding revoked by the government for supporting the protests. The role of Church has also come under the scrutiny. The pro-government calls the movement “Church-orchestrated” and foreign funded.

Response from officials

Former chairman of Atomic Energy Commission of India Srinivasan said, "The Fukushima plant was built on a beach-front, but the Kudankulam was constructed on a solid terrain and that too keeping all the safety aspects in mind. Also, we are not in a tsunami prone area. The plants in Kudankulam have a double containment system which can withstand high pressure. At least ₹14,000 crore has been spent. If we don't operate the plant immediately, it will affect the economic stability of our country".
A centre panel constituted by the Government of India, which did a survey of the safety features in the plant, vouched for the safety of the Kudankulam reactors. Dr Muthunayagam, who headed the panel, said that the protesters asked for some documents which are not related to the safety of the reactor. Nuclear scientist and principal scientific adviser to the federal Government of India Rajagopala Chidambaram has said "We have learnt lessons from the Fukushima nuclear accident, particularly on the post-shut-down cooling system", and also added Fukushima nuclear accident should not deter or inhibit India from pursuing a safe civil nuclear programme.
The Tamil Nadu state government formed a four-member expert panel which submitted a report to the government after inspecting the safety features of the plant. The Tamil Nadu government in the wake of the acute power shortages in the state has ordered in favour of the commissioning of the plant.

Allocation of power

Government of India announced the power allocation from the two units of the reactor on 29 August 2013.
BeneficiaryPower (MW)
Tamil Nadu925 MW
Karnataka442 MW
Kerala266 MW
Puducherry67 MW
Not allocated300 MW
Total2,000 MW
Tamil Nadu may get another 100 MW over its allocation.

Nuclear Power Corporation of India

http://www.npcil.nic.in/
The Nuclear Power Corporation of India Limited (NPCIL) is a government-owned corporation of India based inMumbai in the state of Maharashtra. It is wholly owned by the Central Government and is responsible for the generation of nuclear power for electricity. NPCIL is administered by the Department of Atomic Energy, Govt. of India (DAE).
NPCIL was created in September 1987 under the Companies Act 1956, "with the objective of undertaking the design, construction, operation and maintenance of the atomic power stations for generation of electricity in pursuance of the schemes and programmes of the Government of India under the provision of the Atomic Energy Act 1962." All nuclear power plants operated by the company are certified for ISO-14001 (Environment Management System).
NPCIL was the sole body responsible for constructing and operating India's commercial nuclear power plants till setting up of BHAVINI ( Bharatiya Nabhikiya Vidyut Nigam ) in October 2003. As of 10 August 2012 the company had 21nuclear reactors in operation at seven locations, a total installed capacity of 5780 MWe.[4][5] Subsequent to the government's decision to allow private companies to provide nuclear power, the company has experienced problems with private enterprises "poaching" its employees.

Nuclear plants

Operational

UnitTypeCapacity
(MWe)
Since
TAPS-1 (Tarapur, Maharashtra)BWR16028 October 1969
TAPS-2 (Tarapur, Maharashtra)BWR16028 October 1969
TAPS-3 (Tarapur, Maharashtra)PHWR54018 August 2006
TAPS-4 (Tarapur, Maharashtra)PHWR54015 September 2005
RAPS-1 (Rawatbhata, Rajasthan)PHWR10016 December 1973
RAPS-2 (Rawatbhata, Rajasthan)PHWR2001 April 1981
RAPS-3 (Rawatbhata, Rajasthan)PHWR2201 June 2000
RAPS-4 (Rawatbhata, Rajasthan)PHWR22023 December 2000
RAPS-5 (Rawatbhata, Rajasthan)PHWR2204 February 2010
RAPS-6 (Rawatbhata, Rajasthan)PHWR22031 March 2010
MAPS-1 (Kalpakkam, Tamil Nadu)PHWR22027 January 1984
MAPS-2 (Kalpakkam, Tamil Nadu)PHWR22021 March 1986
NAPS-1 (Narora, Uttar Pradesh)PHWR2201 January 1991
NAPS-2 (Narora, Uttar Pradesh)PHWR2201 July 1992
KAPS-1 (Kakrapar, Gujarat)PHWR2206 May 1993
KAPS-2 (Kakrapar, Gujarat)PHWR2201 September 1995
KGS-1 (Kaiga, Karnataka)PHWR2206 November 2000
KGS-2 (Kaiga, Karnataka)PHWR2206 May 2000
KGS-3 (Kaiga, Karnataka)PHWR2206 May 2007
KGS-4 (Kaiga, Karnataka)PHWR22027 November 2010
KKNPP-1 (Kudankulam, Tamil Nadu)VVER100022 October 2013
KNPP-2 (Kudankulam, Tamil Nadu)VVER1000July-2016
Total Capacity6780

Under construction

Unit Under ConstructionTypeCapacity
(MWe)
Expected Date
KAPS-3 (Kakrapar, Gujarat)PHWR700July-2016[7]
KAPS-4 (Kakrapar, Gujarat)PHWR700Dec-2016[7]
RAPS-7 (Rawatbhata, Rajasthan)PHWR700August-2016[8]
RAPS-8 (Rawatbhata, Rajasthan)PHWR700Dec-2016[8]
Total Capacity3800

Proposed

Power PlantTypeCapacity
(MWe)
Expected Commissioning Date
Jaitapur in MaharashtraEPR9900 (6x1650 MW)2019
Gorakhpur in HaryanaPHWR2800 (4x700 MW)2021
Mithi Virdi in GujaratLWR6000 (6 x 1000 MW)
Kovvada in Andhra PradeshESBWR6000 (6 x 1000 MW)
Chutka in Madhya PradeshPHWR1400 (2 x 700 MW)
Bhimpur, Shivpuri in Madhya PradeshPHWR2800 (4 x 700 MW)
Total Capacity28900