Generating Stations & their Capacities in Kerala

. KSEB HYDRO
Name of Station
POWER (in Mega Watts) ENERGY (in Million Units)
PALLIVASAL
37.50 MW
(3 x 5 MW + 3 x 7.5 MW)
284.00 MU
SENGULAM
48.00 MW
(4 x 12 MW)
182.00 MU
PORINGALKUTHU
32.00 MW
(4 x 8 MW)
170.00 MU
NERIAMANGALAM
52.50 MW
251.60 MU
PANNIAR
30.00 MW
(2 x 15 MW)
148.00 MU
SABARIGIRI
325.00 MW
1338.00 MU
SHOLAYAR
54.00 MW
(3 x 18 MW)
233.00 MU
KUTTIYADI
75.00 MW
(3 x 25 MW)
248.00 MU
IDUKKI
780.00 MW
(6 x 130 MW)
2398.00 MU
IDAMALAYAR
75.00 MW
(2 x 37.5 MW)
320.00 MU
KALLADA
15.00 MW
(2 x 7.5 MW)
65.00 MU
PEPPARA
3.00 MW
(1 x 3 MW)
11.50 MU
LOWER PERIYAR
180.00 MW
(3 x 60 MW)
493.00 MU
MADUPPETTY
2.00 MW
(1 x 2 MW)
6.40 MU
PORINGAL LEFT BANK EXTN.
16.00 MW
(1 x 16 MW)
74.00 MU
KAKKAD
50.00 MW
(2 x 25 MW)
262.00 MU
KUTTIADI EXTENSION SCHEME
50.00 MW
(1 x 50 MW)
75.00 MU
MALAMPUZHA SHEP
2.50 MW
(1 x 2.5 MW)
5.60 MU
CHEMBUKADAVU - I
2.70 MW
(3 x 0.9 MW)
6.24 MU
CHEMBUKADAVU - II
3.75 MW
(3 x 1.25 MW)
9.66 MU
URUMI - I
3.75 MW
(3 x 1.25 MW)
9.53 MU
URUMI - II
2.40 MW
(3 x 0.8 MW)
6.10 MU
MALANKARA
10.50 MW
(3 x 3.50 MW)
65.00 MU
LOWER MEENMUTTY
3.50 MW
(2 x 1.50 MW + 1 x 0.50 MW)
7.00 MU
NERIAMANGALAM EXTENSION
25.00 MW
58.00 MU
2. DIVERSION /AUGMENTATION SCHEMES
VAZHIKKADAVU24.00 MU
PANNIAR AUGMENTATION10.00 MU
NARAKAKKANAM (TO IDUKKI)7.00 MU
PORINGAL (TO IDAMALAYAR)60.00 MU
AZUTHA57.00 MU
VADAKKEPUZHA12.00 MU
KUTTIADI AUGMENTATION223.00 MU
KSEB HYDRO TOTAL
1912.10 MW
7235.63 MU
3. CAPTIVE HYDRO
MANIAR 12.00 MW
(3 x 4 MW)
37.00 MU
KUTHUNGAL21.00 MW
(3 x 7 MW)
.00 MU
PRIVATE HYDRO TOTAL33.00 MW
116 MU
HYDRO TOTAL1883.60 MW7174.28 MU
4. KSEB THERMAL
BRAHMAPURAM 106.60 MW
(5 x 21.32 MW)
535.00 MU
KDPP, KOZHIKODE 128.00 MW
(8 x 16 MW)
896.00 MU
KSEB THERMAL TOTAL234.60 MW1431.00 MU
5. CENTRAL PUBLIC SECTOR-THERMAL
KAYAMKULAM (N.T.P.C.)
359.58 MW
(2 x 116.60 MW + 1 x 126.60 MW)
2094.00 MU
6. THERMAL- IPPs
B.S.E.S.KERALA POWER LIMITED, KOCHI (I.P.P.)157.00 MW
(3 x 40.5 MW + 1 x 35.5 MW)
1099.00 MU
KPC,KASARAGOD (I P P)20.44 MW140.00 MU
IPP THERMAL TOTAL177.44 MW1239.00 MU
THERMAL TOTAL771.62 MW4764.00 MU
7. WIND ENERGY (KSEB)
WIND FARM, KANJIKODE 2.03 MW
(9 x 0.225 MW)
5.00 MU
RAMAKKALMEDU (Private Sector) 10.50 MW
(14 x 0.75 MW)
20.24 MU
AGALI (Private Sector) 6.00 MW
(10 x 0.6 MW)
12.01 MU
WIND TOTAL18.53 MW37.25 MU
GRAND TOTAL2702.25 MW12036.88 MU

PALLIVASAL
37.50 MW
(3 x 5 MW + 3 x 7.5 MW)
284.00 MU
SENGULAM
48.00 MW
(4 x 12 MW)
182.00 MU
PORINGALKUTHU
32.00 MW
(4 x 8 MW)
170.00 MU
NERIAMANGALAM
52.50 MW
251.60 MU
PANNIAR
30.00 MW
(2 x 15 MW)
148.00 MU
SABARIGIRI
325.00 MW
1338.00 MU
SHOLAYAR
54.00 MW
(3 x 18 MW)
233.00 MU
KUTTIYADI
)
248.00 MU
IDUKKI
780.00 MW
(6 x 130 MW)
2398.00 MU
IDAMALAYAR
75.00 MW
(2 x 37.5 MW)
320.00 MU
KALLADA
15.00 MW
(2 x 7.5 MW)
65.00 MU
PEPPARA
3.00 MW
(1 x 3 MW)
11.50 MU
LOWER PERIYAR
180.00 MW
(3 x 60 MW)
493.00 MU
MADUPPETTY
2.00 MW
(1 x 2 MW)
6.40 MU
PORINGAL LEFT BANK EXTN.
16.00 MW
(1 x 16 MW)
74.00 MU
KAKKAD
50.00 MW
(2 x 25 MW)
262.00 MU
KUTTIADI EXTENSION SCHEME
50.00 MW
(1 x 50 MW)
75.00 MU
MALAMPUZHA SHEP
2.50 MW
(1 x 2.5 MW)
5.60 MU
CHEMBUKADAVU - I
2.70 MW
(3 x 0.9 MW)
6.24 MU
CHEMBUKADAVU - II
3.75 MW
(3 x 1.25 MW)
9.66 MU
URUMI - I
3.75 MW
(3 x 1.25 MW)
9.53 MU
URUMI - II
2.40 MW
(3 x 0.8 MW)
6.10 MU
MALANKARA
10.50 MW
(3 x 3.50 MW)
65.00 MU
LOWER MEENMUTTY
3.50 MW
(2 x 1.50 MW + 1 x 0.50 MW)
7.00 MU
NERIAMANGALAM EXTENSION
25.00 MW
58.00 MU
2. DIVERSION /AUGMENTATION SCHEMES
VAZHIKKADAVU 24.00 MU
PANNIAR AUGMENTATION 10.00 MU
NARAKAKKANAM (TO IDUKKI) 7.00 MU
PORINGAL (TO IDAMALAYAR) 60.00 MU
AZUTHA 57.00 MU
VADAKKEPUZHA 12.00 MU
KUTTIADI AUGMENTATION 223.00 MU
KSEB HYDRO TOTAL
1912.10 MW
7235.63 MU
3. CAPTIVE HYDRO
MANIAR 12.00 MW
(3 x 4 MW)
37.00 MU
KUTHUNGAL 21.00 MW
(3 x 7 MW)
79.00 MU
PRIVATE HYDRO TOTAL 33.00 MW
116 MU
HYDRO TOTAL 1883.60 MW 7174.28 MU
4. KSEB THERMAL
BRAHMAPURAM 106.60 MW
(5 x 21.32 MW)
535.00 MU
KDPP, KOZHIKODE 128.00 MW
(8 x 16 MW)
896.00 MU
KSEB THERMAL TOTAL 234.60 MW 1431.00 MU
5. CENTRAL PUBLIC SECTOR-THERMAL
KAYAMKULAM (N.T.P.C.)
359.58 MW
(2 x 116.60 MW + 1 x 126.60 MW)
2094.00 MU
6. THERMAL- IPPs
B.S.E.S.KERALA POWER LIMITED, KOCHI (I.P.P.) 157.00 MW
(3 x 40.5 MW + 1 x 35.5 MW)
1099.00 MU
KPC,KASARAGOD (I P P) 140.00 MU
L 1239.00 MU
4764.00 MU
5.00 MU
20.24 MU
12.01 MU
37.25 MU
12036.88 MU

Power Generation in India 2010

Power Generation in India

Installed Capacity
in MW
As on November 30, 2007 As on November 30, 2010
Coal 73492.38 89778.38
Diesel 1201.75 1199.75
Gas 14581.71 17624.85
Total 89275.84 108602.98
Wind and Renewable Energy 10175.03 16786.98
Nuclear 4120.00 4560.00
Hydro 34680.76 37367.40
Grand Total 138251.63 167317.36
Power Mix (2010)

Thermal: 65 per cent
Hydro: 25 per cent
Nuclear: 3 per cent
Renewable: 7 per cent
powerline
Gross Generation 2004-05
Hydro 84497 GWh
Nuclear 16638 GWh
Thermal and Wind 486031 GWh
No. Villages electrified 498286
Length of Transmission & Distristribution lines 6497727 Circuit km.
Per Capita consumption 606.2 kWh
Loss-- Transmission, Distribution, Transformation and Unaccounted energy 32.15%
Update: Gross generation in the country increased from 704.469 billion units in 2007-08 to 723.794 billion units in 2008-09. Generation was 662.5 billion units in 2006-07 and 617.5 billion units in the previous year.

SCADA -UTILITY AUTOMATION

Supervisory control and data acquisition (SCADA) systems have traditionally played a vital role by providing utilities with valuable knowledge and capabilities that are key to a primary business function - delivering power in a reliable and safe manner. A quality SCADA solution is central to effective operation of a utility's most critical and costly distribution, transmission, and generation assets.
The challenging issues for SCADA systems and projects today are not the same as they were a few years ago. Today, there is much more importance placed on integration, use of new communication and network technologies, access to information by more users, and other purposes.
Today’s SCADA systems, in response to changing business needs, have added new functionalities and are aids for strategic advancements towards interactive, self healing smart grids of the future. A modern SCADA system is also a strategic investment which is a must-have for utilities of all sizes facing the challenges of the competitive market and increased levels of real time data exchange that comes with it (independent market operator, regional transmission operator, major C&I establishments, etc.). A well planned and implemented SCADA system not only helps utilities deliver power reliably and safely to their customers but also helps to lower costs and achieve higher customer satisfaction and retention. Modern SCADA systems are already contributing and playing a key role at many utilities towards achieving:
  • New levels in electric grid reliability – increased revenue.
  • Proactive problem detection and resolution – higher reliability.
  • Meeting the mandated power quality requirements – increased customer satisfaction.
  • Real time strategic decision making – cost reductions and increased revenue.

POWER STATION INSTRUMENTATION CONTROL

Sinclair Knight Merz has extensive Instrumentation and Control experience in power stations and plant auxiliaries involving engineering design and documentation, project management, retrofitting and fuel conversions. Our Automation team covers the various mechanical and electrical aspects of power generation using hydropower, steam turbine, gas turbine, diesel, and combined cycle technology.
The company has successfully completed projects ranging from small hydro, diesel, or steam turbines operating on waste heat recovery boilers to the complete design and construction of major power stations requiring innovative use of new and advanced techniques.

We offer skills in:
  • Instrumentation systems and Intelligent Electronic Devices
  • Programmable logic controllers
  • Data transmission systems, LANs, WANs (Fieldbus, Profibus, etc)
  • Software and protocol development
  • Telephone, radio, and power line carrier technologies
  • Plant-wide data logging
  • Process control systems (DCS)
  • IT interfacing
  • Specialised electronic development
  • Access control and monitoring of building services.
For clients who desire a fully integrated, "best of breed" solution, we will partner with them in providing custom system designs and a complete integration and database configuration service. Please refer to our Integration of Custom Systems information.